Temporary Best Management Practices (BMPs) are required during
all construction in the Tahoe Basin, until permanent BMPs have been
installed on the disturbed site. Temporary BMPs differ from permanent
BMPs because they are designed to remain effective for a relatively
short duration of time, usually only until a construction site is
completed and permanent BMPs can be applied. Depending on the nature
of the activity and site characteristics, a variety of different
BMPs may be employed to keep sediment from leaving a construction
area.
|